Blink Charging Awarded Grant Funds to Deploy DC Fast Chargers by the Massachusetts Department of Environmental Protection under the Massachusetts Electric Vehicle Incentive Program

Blink to deploy 8 DC fast charging stations across Massachusetts

Miami Beach, FL, March 16, 2022 (GLOBE NEWSWIRE) — Blink Charging Co. (Nasdaq: BLNK, BLNKW) (“Blink” or the “Company”), a leading owner, operator, and provider of electric vehicle (EV) charging equipment and services. For they  announced to be awarded Massachusetts EV charging grants. All from the Massachusetts Department of Environmental Protection (MassDEP) to install 8 dual-port 75-175kW DC fast-charging stations across the state of Massachusetts.

The Blink award, totaling $800,000, were awarded under the Massachusetts Electric Vehicle Incentive Program (MassEVIP). All which provides grants for installing DC fast-charging stations at strategic locations around the state. The grants are also part of a significant effort by Massachusetts EV efforts to create a reliable EV infrastructure. Those that supports the Commonwealth’s energy future and emissions reduction goals.

In addition, Massachusetts has announced a goal of ending the sale of new gas-powered vehicles by 2035. The Commonwealth will also seek to have 30 percent of all trucks and bus sales be zero-emission vehicles by 2030. Thereby hoping to reach 100 percent of sales by 2050.

In addition, Blink will install eight dual-port DC fast chargers. All most importantly in strategic locations. All to further develop the state’s charging corridors and convert more drivers to EVs. The chargers will also fill existing gaps. Especially in EV charging access along major highways. Finally and be hosted by familiar consumer brands. All along Route 90, Route 95, and Route 20.

In addition blink will install eight dual port dc fast chargers All most importantly in strategic locations All to further develop the state&aposs charging corridors and convert more drivers to evs The chargers will also fill existing gaps Especially in ev charging access along major highways Finally and be hosted by familiar consumer brands All along route 90 route 95 and route 20

In conclusion, the installation of Blink’s DC fast charging stations are part of this grant. It is aware to aware include the following locations:

Brookline

Sunoco, 454 Harvard Street

Canton

Sunoco, 702 Neponset Street

Lenox

Burger King, 500 Pittsfield Road

Northampton

Burger King, 344 King Street

Norwell

Sunoco, 117 Pond Street

Somerset

Sunoco, 525 County Street

Springfield

Burger King, 727 Boston Road

Worcester

Sunoco, 527 Southwest Cutoff

Source: BLINK CHARGING https://www.blinkcharging.com/.

Download as PDF

March 16, 2022 9:15am EDT

This is a sponsored post

author avatar
greenlivingguy
The Green Living Guy, Seth Leitman is an independent power producer, a green living expert, and Editor of the McGraw-Hill, TAB Green Guru Guides. Seth is also an Author, Radio Host, Reporter, Writer and an Environmental Consultant on green living. The Green Living Guy writes about green living, green lighting, the green guru guides and more. Seth's books range from: # Build Your Own Electric Vehicle by Bob Brant and Seth Leitman (2nd and 3rd editions) # Build Your Own Plug-in Hybrid Electric Vehicle by Seth Leitman # Build Your Own Electric Motorcycle by Carl Vogel # Green Lighting by Seth Leitman, Brian Clark Howard and Bill Brinsky # Solar Power For Your Home by David Findley # Renewable Energies For Your Home by Russel Gehrke # Do-it-Yourself Home Energy Audits by David Findley # Build Your Own Small Wind Power System by Brian Clark Howard and Kevin Shea # and more green living books to follow.

more insights

Tesla Q3 2026 : Vehicle Deliveries Beat While ES Missed Targets

Tesla’s Q3 2026 results reveal a complex narrative: while the company delivered 486,532 vehicles—beating Wall Street expectations by 25,000—this achievement comes with a 2.1% decline from last year’s record. High gasoline prices are driving consumers toward electric vehicles, compensating for the loss of federal incentives. However, Tesla’s narrow product lineup and missed energy storage targets raise questions about its long-term strategy. As the company prepares to report earnings, the focus shifts to whether this delivery surge translates into sustainable profits. Dive deeper into the intricacies of Tesla’s performance and the broader market forces at play.

Read more >
Link Categories

Discover more from The Green Living Guy

Subscribe now to keep reading and get access to the full archive.

Continue reading

Verified by MonsterInsights